Question
What are the Agenda, Grid and Concurrent views?
Three ways to look at the same timeline, so each job has the view that suits it. Switch between them with the tabs at the top of the Timeline.



Without Genevi
With Genevi
One spreadsheet layout for every job
Agenda to plan, Grid to run the day, Concurrent to see what overlaps
A separate sheet for each vendor's lane
Concurrent shows one lane per vendor on a shared clock
Reformatting the spreadsheet before you print it
Grid is the run sheet, ready to print
Every view shows the same live timeline. A change in one shows in all three.
